Win the jobwhile they'restill measuring.
Back from site, plan the job on a satellite photo of the client's property. SiteTower measures it, prices it at your rates, and builds a proposal the client can sign.

Fast proposals. Unlimited jobs. One flat price.
Measure the job, price it at your rates, and send a proposal your client can sign. Then run the job from the same place.
Start your free monthSee the platformSend us the job. We build the proposal.
Send photos and a short description. Usually back in two working days. No monthly fee.
Get your first proposal freeHow the proposal service worksLaunch rate: first month free, then R399/mo locked for life, until 31 December 2026. Full pricing
Built for
Pools & Decking
Estimate pool shell concrete volumes, paving coping, timber or composite decking runs, balustrades, and pumps from your layout.
Landscaping & Hardscape
Turn planting plans, retaining walls, paving areas, and instant lawn into priced line items automatically.
Solar & Backup Power
Design roof solar arrays, size inverter & battery storage, and export pre-filled municipal application packs.
Security & Access
Map perimeter electric fencing, sensor beams, and cameras with built-in legal compliance checks.
Ponds & Water Features
Design custom koi ponds and water features, calculate liner dimensions, and auto-estimate filtration systems and pumps.
Sport & Play
Design padel and multi-sport courts, play structures, and safety surfaces with preset footprints, runoff buffers, and floodlight layouts.
From site visit to signed proposal
Most contractors measure in one place, price in a spreadsheet, and write the proposal somewhere else. SiteTower does all three in one go.
Draw Over Satellite Maps
Search a property address and outline borders, fences, decking, arrays, or vegetation right over a 3D Google Maps perspective. Measurements are calculated live as you drag.
Your materials list, worked out for you
SiteTower takes your layout and works out what you actually have to buy: post counts from spacing, concrete volume, cable runs, battery stacks. Your rates, applied the same way every time.
Proposals your client signs online
Build a professional proposal in seconds from your saved rates and margins. Clients read it, switch between the options you offered, watch the total update, and sign on their phone.
Get paid for every change
The biggest profit leak on outdoor jobs is changes nobody writes down. The client asks for a bit more on site, the crew does it, and the office never bills for it.
Changes signed on site
Log the change on your phone, see the new price straight away, and have the client sign on screen before the crew lifts a shovel.
Quoted vs. actual profit
Compare what you quoted with what labour and materials actually cost. Know exactly which jobs made money and which ones lost it.
Extend Boundary Wall
Scope: Plan and price
Lay the job out on a satellite photo of the property and get the materials list worked out for you.
Propose: Send the proposal
Send a proposal in Rand where the client can choose between options, see what the job will look like, and comment or message you on it.
Close: Get it signed
The client signs the option they chose on their phone. The signature is legally binding, time-stamped, and saved with the job.
Manage: Run the job
Schedule your crews, bring sub-contractors into the job, get changes signed on site, and export drawing packs ready for council.
Share: Show off the finished job
Publish photo galleries of finished jobs to collect reviews and bring in new enquiries.
Every job in one place, from first visit to final photo
Your clients, your jobs, and a gallery of your finished work, all in one account.

Priced in Rand. Built for South Africa.
Most construction tools are designed in the US or Europe, then translated. SiteTower is built around how South African contractors actually quote, plan, and get signed off.
Priced and Quoted in Rand
Your subscription and every proposal you send are in Rand, ex-VAT, with VAT shown the way your clients expect. No exchange-rate surprises on your card statement.
SA Materials & Standards
Material lists use local stock sizes and SA trade practice, and SiteTower flags the rules that matter, like SANS 10134 pool barriers and fence height limits.
Council & Application Packs
Export a drawing set your draughtsperson can submit, plus pre-filled solar application packs with panel, inverter, and connection detail already on the page.
POPIA-Conscious by Default
Your client list is commercially sensitive. Company data is isolated per account and encrypted, and we handle it in line with POPIA.
The platform, or the proposal service?
The platform gives you unlimited proposals and runs the job after the client signs. With the proposal service, we build the proposal for you, with no software to learn.
What you pay
Full proposal: scope, pricing, timeline, design, compliance, terms
Client signs online, under your own brand
Compliance checks: pool setbacks, safety fencing, site coverage
Invite clients and sub-contractors by link, no password needed
Comments on the design, and a conversation with each party
Changes signed on site, and invoices
Start your own projects whenever you like
Change the design and reprice it yourself
Your own library of materials, rates and finishes
Schedule crews and sub-contractors
Phone mode for crews: site notes and photo logs
Profit reports: what you quoted against what it cost
Portfolio of finished jobs to win the next one
Users
| What you get | The platformYou build the proposals | Proposal serviceWe build them for you |
|---|---|---|
| What you pay | Free month, then R399/mo | R450 per proposal, first free |
| Full proposal: scope, pricing, timeline, design, compliance, terms | β | β |
| Client signs online, under your own brand | β | β |
| Compliance checks: pool setbacks, safety fencing, site coverage | Live, as you design | Included in the proposal |
| Invite clients and sub-contractors by link, no password needed | β | On projects we built |
| Comments on the design, and a conversation with each party | β | On projects we built |
| Changes signed on site, and invoices | β | On projects we built |
| Start your own projects whenever you like | Unlimited | β |
| Change the design and reprice it yourself | β | One change round included |
| Your own library of materials, rates and finishes | β | β |
| Schedule crews and sub-contractors | β | β |
| Phone mode for crews: site notes and photo logs | β | β |
| Profit reports: what you quoted against what it cost | β | β |
| Portfolio of finished jobs to win the next one | β | β |
| Users | 3 included, more at R149 each | Just you |
Frequently Asked Questions
What is the difference between the platform and the proposal service?
On the platform, you build the proposals yourself. You pay one flat monthly price and get everything: unlimited projects, layouts on a satellite photo of the property, material lists priced at your own rates, proposals your client can sign online, compliance checks as you design, clients and sub-contractors invited to comment and message on the job, changes logged on site, crew scheduling, council packs, and a client page under your own brand. With the proposal service, we build the proposal for you. You send photos and a short description, and we send back a finished proposal your client can sign, usually within two working days. You pay per proposal, with no monthly fee.
Is the platform only for sending proposals?
No. The proposal is one part of it. The platform is where the job lives before and after the sale: change the design, reprice options, collect signatures, log changes from site, schedule crews, and keep every version in one account. If you only need a proposal now and then, use the proposal service. If you want to run the business in one place, use the platform.
Do I need the platform if I use the proposal service?
No. The proposal service works on its own, and nobody on your team has to use any software. You still get an account in your business name, so your rates and finished proposals are kept there. When you are ready to build proposals yourself, you move to the platform without re-entering anything.
Can I use both, or switch later?
Yes. Many contractors start with the proposal service while they are busy selling, then move to the platform when they want to build every proposal in-house. It is the same account, so your supplier prices, your clients and every proposal we built carry over. Your first month on the platform is free. Already on the platform? In a heavy week you can still send us a job from inside your account for R450.
Which should I start with?
The proposal service if you want a finished proposal without learning software, only quote now and then, or need to win a job this week. The platform if you quote regularly and want more than proposals: control of the design, unlimited projects, your team on one account, changes on site, and scheduling. Your first proposal from the service is free, and so is your first month on the platform, so you can try either before you pay.
Who is SiteTower built for?
SiteTower is purpose-built for South African exterior contractors β pool builders, landscapers, solar installers, security fencing specialists, pond contractors, and sports/play area builders. If you quote outdoor jobs in Rand, it's built for you.
Do I need design experience to use it?
No. You work on a real satellite photo of the property, with ready-made shapes for courts, pools, decks, and more. You trace what's already there, drop in a shape, and SiteTower does the maths.
How does the materials list work?
SiteTower reads your layout (lengths, areas, volumes) and applies SA trade formulas to work out quantities: concrete, decking boards, fencing posts, solar panels, pumps. You check and adjust before it goes into the proposal, but you are correcting a list, not building one from scratch.
How accurate are measurements taken off the satellite view?
Scale comes from Google Maps imagery. That's accurate enough to lay a job out and quote it, but it isn't a surveyed site plan and we won't pretend otherwise. Where a dimension has to be exact, measure one edge on site and calibrate the drawing against it; the rest of the plan rescales to match. Quote off the drawing; set out off your tape.
Can clients pay their deposit through SiteTower?
Not yet, and we'd rather say so than surprise you. Clients review, choose their options, and sign in SiteTower; you invoice and collect the deposit the way you do today. Online card and EFT collection is on the roadmap, and launch-rate customers get a direct say in when it lands.
Does it sync with Xero, Sage, or Zoho?
Not at launch. What you get instead is one place where every accepted proposal, change order, and job total already lives, so your bookkeeper is reading a single record rather than reconstructing it from WhatsApp and paper. Direct accounting integrations come once the design-to-quote core is right.
Is there a free trial?
Yes. Your first month on the platform is free. It starts with a setup session, where we load your rates and your first real job with you, so you judge SiteTower on your own numbers and not a demo. After the free month it is R399/mo at the launch rate. If it is not for you, cancel before the month ends and you pay nothing. No card is needed to start.
What does the launch rate include?
First month free. Then R399/mo ex-VAT, locked for life, for accounts opened before 31 December 2026. Full platform access at 60% off the standard R999/mo, with free setup help, your branding added for you, and a direct say in what we build next.
Don't want to learn new software?
Send us the job instead. We measure the property, work out the materials, price it at your supplier rates, and send back a finished proposal your client can sign, usually within two working days. First proposal free.
Start with a free month
First month free. Then R399/mo ex-VAT, locked for life, for accounts opened before 31 December 2026. The full platform at 60% off the standard R999/mo, free setup help included.
